Connecting to sources…

How to build Faze4 3D-printed 6-axis arm with cycloidal gearboxes: the whole process

107 steps to build Faze4 3D-printed 6-axis arm with cycloidal gearboxes, from buying parts, printing and assembly to software, calibration and training, with the bill of…

The creator's estimate: under $1,000 for the whole arm in the README and official video, about $1,000 on Hackaday and about $1,000–1,500 in the docs, none saying what is included; the BOM carries no prices. The official store sells no kit, only the STEP files (€23 in the collector's Singapore market on 2026‑11‑04)

Buy parts

  • Buy the required parts

    All parts can be bought from eBay and similar online stores. The author bought the steppers, drivers, and PSUs from stepper online.

  • Find the bill of materials

    Find the bill of materials in the linked Excel document and building instructions file.

  • Buy extra bearings and screws

    Buy more bearings and screws than needed because some may be damaged during assembly.

  • Wait for the revised PCB

    PCB V1 is marked as old and not recommended because it contains many errors; the document recommends waiting for the next version.

  • Collect the build resources

    Download the building instructions PDF, BOM_7_11_2023.xlsx, and STL_V2.zip, and open the linked documentation. Use the BOM to obtain the arm’s parts.

Print and make

  • Prepare the reworked 27-to-1 shaft

    This changed part is named “27to1 esc_shaft_rework _2” and is located in the rework folder inside the STL folder.

  • Prepare the reworked 27-to-1 discs

    This part is also named “27to1 disc_rework” and is in the same folder as the changed shaft.

  • Print the arm and reducers

    3D-print the six-axis arm structure and the cycloidal reducers. Use less infill when printing the arm to reduce its weight from approximately 14–15 kg.

  • Prepare the 3D-printed parts

    Download the STL_V2.zip print files and follow the linked printing tips when producing the parts.

Assemble

  • Assemble the joint 6 output shaft

    Assemble one Joint 6 Output shaft with 12 M3 4mm brass inserts, one M2 5mm screw, two M2 nuts, one 35x47x7 ball bearing, and one M3 nut. Heat each brass insert with a soldering iron, then press it into its hole so it does not peak above the plastic.

  • Fit the wrist case and inductive sensor

    Fit the Wrist case onto the output-shaft assembly. Install one inductive sensor in the Wrist case and secure it with two M8 nuts; do not tighten the nuts too much because the sensor will need adjustment.

  • Route wires and mount the wrist motor

    Route the stepper wires and sensor wires through the channels in the 3D-printed part and bring them out through the hole marked green. Pull the sensor wires through the specified hole, leave the stepper wires at the required opening, and mount the Nema 14, 19:1 gearbox motor with four M3 5mm screws.

  • Route Wires and Secure Motor

    Route the wires through the case and secure the motor to it with 4x M3 screws.

  • Join Output and Gearbox Shafts

    Attach the output shaft to the gearbox shaft and align the flat ends of both shafts.

  • Install Sensor and Set Screw

    Remove the M2 screws and nuts from the output shaft and unscrew the sensor. Align the holes in the 3D-printed wrist and output shaft, insert and tighten the M3 4mm set screw, then refit the M2 screw and nuts and position the sensor close to the screw without touching it.

  • Fit the Wrist Cover

    Insert the wrist cover and secure it with 2x M2 5mm screws.

  • Install Twelve Roller Pin Assemblies

    Build 12 roller pin assemblies from 3x8x4 ball bearings, J5 ring rollers, and M3 25mm screws. Place each assembly in its marked position and secure it; cleaning and assembling all 12 can take up to 1 hour.

  • Insert One Assembled Cyclo Disc

    Use two 11:1 cyclo discs and two 17x23x4 ball bearings for the assemblies, but insert only one assembled cyclo disc at this stage.

  • Install Eccentric Shaft and Set Screw

    Install the J5 eccentric shaft, M3 nut, and M3 4mm set screw. Do not overtighten the set screw; when resistance is felt, make one additional half turn only.

  • Install the Second Cyclo Disc

    When fitting the second cyclo disc, try to align the two holes in the discs. Exact alignment may not be possible, but the closest configuration should be correct.

  • Install Pneumatic Gripper Tubing

    Fit 2 pneumatic bulkhead connectors with 4mm x M12 threads and 2 M12 nuts, then route the 4mm pneumatic tube through the two side holes and the same hole used for the stepper wires. The pneumatic option is not tested.

  • Install the Servo Gripper Plug

    Pull the wires through one of the designated holes, insert the servo gripper plug, and secure it around the parts marked RED with 2 zip ties. This servo option is tested and used.

  • Install limit switch and bearing

    Install 1 micro limit switch and 1 35x47x7 ball bearing, then secure them with 2 M2 8mm screws.

  • Assemble Joint 5 output side

    Install 1 Joint 5 output shaft, 10 output spacers, 5 M3 20mm screws, and 10 3x8x4 ball bearings at the listed positions. If the output shaft is difficult to insert, align the dots on the cyclo discs; do not overtighten the bearings because they must turn freely.

  • Route wires through wrist trigger

    Install 1 Joint 5 switch trigger and 2 35x47x7 ball bearings. Pull the wrist wires through the bearing and the J5 switch trigger, route them as shown in Step 1 of Forearm Assembly, and secure them with screws later.

  • Fit cover, pulleys, and belt

    Install the forearm top cover with 6 M3 10 mm screws and 3 M3 15 mm screws. Install 7 M3 15 mm screws, 2 J5 28-tooth pulleys, and 1 10 mm-wide HTD 5M 430 mm timing belt; insert only one screw into the second pulley so the belt can be tightened.

  • Tighten pulley and route wrist wires

    Insert the remaining M3 15 mm screws into the pulley; if the belt is not tight enough, place additional 3x8x4 or 3x10x4 ball bearings in the holes marked red. Route the wrist wires through the channels marked green and through the red hole shown in Step 1 of Forearm Assembly.

  • Install Joint 4 shaft

    Install 1 Joint 4 shaft and 7 M5 20mm IMBUS screws. Route all wires, and any pipes being used, through the hole marked red.

  • Assemble Joint 4 cyclo side

    Assemble 1 Joint 4 motor case, 12 ring spacers, 1 Nema 17 motor, 4 M3 5mm screws, 12 M3 25mm screws, and 24 3x8x4 ball bearings at the listed positions. Install 2 11:1 cyclo discs, 2 17x23x4 ball bearings, and 1 eccentric J4 shaft in the same arrangement as the Joint 5 cyclo.

  • Install Joint 4 output shaft

    Install 1 M3 nut and 1 M3 4mm set screw, making sure the holes on the discs are aligned. Then install 1 J4 cyclo output shaft, 1 M3 20mm screw, 10 3x8x4 ball bearings, and 10 Joint 4 output spacers.

  • Fit elbow bearing and cover

    Install 1 35x47x7 ball bearing and 1 Joint 4 top cover, then secure the cover with 5 M3 10 mm screws.

  • Finish Joint 4 Top Cover Wiring

    Watch the orientation of the Joint 4 top cover holes and the wire marked with red.

  • Install Joint 3 Stepper

    Install the Nema 23 Bipolar 0.9deg 2.8A 2.5V 57x57x56mm stepper, four M5 8mm HEX screws, and two Joint 3 main case parts. Fit the Joint 3 cover with three M3 10mm screws, with the stepper red dot on the side where the wires are.

  • Install Elbow Bearings and Discs

    Fit two 15x28x7 ball bearings and two 15:1 cyclo discs. Route the stepper wires through the channel on the bottom and then through the large hole on the side.

  • Assemble Joint 3 Disc Stack

    Fit 48 3x8x4 ball bearings, 32 Joint 3 ring spacers, and 16 M3 25mm screws. Repeat the process on top 16 times.

  • Install Joint 3 Eccentric Shaft

    Install the Joint 3 eccentric shaft with one M3 4mm set screw and one M3 nut.

  • Install Joint 3 Output Shaft

    Align all holes on the discs, then fit 32 3x10x4 ball bearings, eight M3 30mm screws, and the J3 output shaft. Do not overtighten the bearings; they must rotate freely.

  • Install Joint 3 Top Cover

    Fit two 50x65x7 ball bearings and the Joint 3 top cover. Secure it with eight M3 30mm screws.

  • Complete Elbow Assembly Step 10

    Complete the assembly using the Elbow Assembly diagrams for Step 10.

  • Install Elbow Limit Switch

    Install the micro limit switch with two M2 8mm screws, routing its wires through the hole marked with red. Install the M3 15mm screw so its head is level with the screws of the micro limit switch.

  • Install Elbow M3 Screws

    Install ten M3 20mm screws at the indicated position.

  • Complete Elbow Assembly Step 13

    Complete the assembly using the Elbow Assembly diagrams for Step 13.

  • Install Lower Arm Pulley

    Fit the 28-tooth Joint 4 pulley. Pull all wires through the pulley, but only those coming from the forearm and wrist assembly; attach it with a screw later.

  • Fit J4 pulley and screws

    Use one 26-tooth J4 pulley at position 1 and six M3 15 mm screws at position 2.

  • Install J4 belt and screws

    Fit one J4 Belt and six M3 15 mm screws in the illustrated lower-arm assembly.

  • Insert and tighten belt screws

    Insert one M3 20–25 mm screw first and tighten the belt, then insert the other screws; use six in total.

  • Attach fork and fork motor

    Assemble one Fork and one Fork motor, then secure them with M5 HEX screws: three 20 mm screws at the top and five 30 mm screws at the bottom.

  • Fasten arm assembly screws

    Use eight M3 30 mm screws at position 1 in the illustrated Arm Assembly.

  • Install bearing, wires, and screws

    Install one 35x47x7 ball bearing and the Fork wires, and secure them with four M5 HEX 20 mm screws.

Software

  • Set up the low-level software

    Follow the low-level setup instructions in the linked documentation.

  • Set up ROS and Matlab code

    Use the high-level code and related instructions in the linked documentation for ROS and Matlab.

Calibrate and test

  • Align limit trigger holes

    Adjust the holes on the limit trigger to match those on the Elbow assembly. If they do not match, move the trigger one hole up or down.

Common problems

  • Editable CAD files are missing, preventing adaptation to different sensor dimensions #10
  • Incorrect mesh origins prevent proper simulator import using the URDF #12
  • Different motor dimensions force manual cutting of the printed joint cover #11
  • The BOM lists the wrong bearing size, so the correct bearing cannot be sourced #6
  • The broken assembly-instructions link prevents builders from accessing the build steps #7

Parts

  • Steppers: one each of three NEMA 23s (57×57×56 mm 2.8A 0.9°, 57×57×84 mm 4A, 57×57×56 mm 1.5A), two NEMA 17s (42×42×40 mm) and one NEMA 14 (L=33 mm) with a 19:1 gearbox
  • 3D-printed cycloidal reducers: joint 1 15:1 plus a 5:3 belt (25:1), joint 2 27:1, joint 3 15:1, joint 4 11:1 plus a 28:26 belt, joint 5 11:1; joint 6 a 19.19:1 planetary
  • One each of 490 mm, 430 mm and 285 mm HTD 5M belts, all 10 mm wide
  • Bearings: 200 of 3×8×4, 40 of 3×10×4, 32 of 5×10×4, 13 of 5×16×5, 8 of 35×47×7, 8 of 50×65×7 and more; hundreds of M2–M10 screws and 12 M3 brass inserts
  • 2 inductive sensors, 3 micro limit switches and 2 roller limit switches; 4 mm pneumatic tube and two M12 bulkhead fittings (for the gripper)
  • Electronics: a Teensy 3.5, the Faze4 V2 distribution board (schematic and board files in the repo), six stepper drivers and 24V and 5V supplies (models not specified)

Tools

  • A 3D printer with at least a 250×210×200 mm build volume (designed for a Prusa MK2S), PETG recommended; 0.15 mm layers for small parts and 0.35 mm for large ones, 25–30% infill
  • Matlab R2018a with Robotics Toolbox 10.3.1, and Arduino IDE 1.8.13 with Teensyduino 1.53 (the versions in the docs)

Skills

  • Printing the cycloidal gearboxes and getting their tolerances right (there is an official video on it), then assembling about 1,000 parts from the Assembly instructions 3.1 PDF
  • Wiring the distribution board, stepper drivers and 24V sensors; the docs warn that the V1 board has errors and is not recommended, and that some drivers cannot be wired as drawn
  • Matlab and Teensy programming; the docs say the high-level code is being ported to ROS and Python

Software

  • Teensy 3.5 low-level code in three versions: for Matlab live-script testing, Matlab trajectory planning and ROS
  • Matlab high-level code: a GUI live script with simulation and trajectory planning; the repo also has a URDF and the work-envelope script Faze4_Work_Envelope.m

Documents